INDUSTRIAL Case Study

BRITISH GYPSUM

Appleyard & Trew were appointed by the British Gypsum to provide Quantity Surveyor and Contract Administrator services on their New Plasterboard Mill Building extension projects. The installation works were undertaken sequentially across two sites, both required accurate programming and coordinated material and equipment deliveries from abroad to allow the staged construction of both the mill and the mill buildings to be continuous. The integration of the mill required meticulous planning by the designers and the contractors, a number being directly employed by British Gypsum.

Roof and wall cladding work were programmed to suit final fit out and commissioning of the mill equipment within a stringent health and safety regime. External services and drainage were completed in the enabling works package to ensure the milling systems were available to commission at the earliest stage.

 

PROJECT OVERVIEW

CLIENT:
British Gypsum

PROJECT TEAM:
Lead Designer: Darnton B3

SERVICES PROVIDED:
Quantity Surveying and Contract Administrator

PROJECT VALUE:
£6 million

KEY INFORMATION

Key Project works included:

  • Significant substructure works to facilitate the new milling installations
  • Milling equipment installation over six levels constructed alongside the main building structure
  • Superstructures were designed to match the existing facade finishing and rainwater installations
  • Onsite Infrastructure upgrades to facilitate the new mill power requirements

QUANTITY SURVEYor

MORE  INDUSTRIAL CASE STUDIES

LET’S DISCUSS A PROJECT

To discuss an Industrial project or to find out more about how we can help you develop your scheme, please contact one of our offices.

Appleyard & Trew LLP
Registered in England & Wales with registered number: OC304430
Registered Office:

Suite 1.2, First Floor, Jackson House, Sibson Road, Sale, Cheshire M33 7RR

© 2024 Appleyard & Trew LLP