SCAPE, Thanet Street

SCAPE, Thanet Street

The scaffolding is going up at Scape Thanet St, London for this redevelopment of student accommodation.

Appleyard & Trew are providing Contract Administration and Quantity Surveying services.

Private Cottage and Leisure Space

Private Cottage and Leisure Space

Refurbishment of an existing listed coach house to form a Cottage and leisure space for a private client at a Hall in Leicestershire is nearing completion.

Our Nottingham office are providing quantity surveying services on this fantastic project!

Castle Street, Stalybridge

Castle Street, Stalybridge

Castle Street, Stalybridge reached Practical Completion last month (16 June 2020) with the handover of Phase 2 which comprises 18 Apartments for sale in two blocks of 12 and 6.

Phase 1 was completed in November 2018 and comprised 38 Apartments for social rent.

The Client is Mosscare St Vincent’s Housing Group – a longstanding Housing Association Client.
Principal Contractor – Rowlinson Constructions
Architect – Pozzoni Architecture Limited
Structural Engineer – Atkinson Peck Limited
Quantity Surveyor, Employer’s Agent and Principal Designer – Appleyard & Trew LLP

These photos illustrate the front block of 12 Apartments plus some interior shots.

Whalley Range, Manchester

Whalley Range, Manchester

The Depot in Whalley Range, Manchester reached Practical Completion last week with the handover of the fourth and final block of 23 Apartments.

The Masterplan development project included 92 fully furnished apartments for market rent which have now been completed for our client Bowes Street Apartments Ltd.

Rowlinson Constructions Limited – Principal Contractor
Buttress – Architect
SGi Shepherd Gilmour – Structural Engineer

We provided Employer’s Agent, Quantity Surveyor and Principal Designer services.

Residential Building Repair Scheme, West London

Residential Building Repair Scheme, West London

Another residential repair scheme handed back by Appleyard & Trew llp to residents on last Friday – this time in West London. The temporary external protection was removed last week to reveal the new permanent external facade to the top floor flats. Internal repairs were completed in December 2019. Thanks to the T&B (Contractors) Ltd site team for successfully managing these works during the current Covid 19 distancing restrictions in conjunction with Robson Walsh Llp design input.